We replaced the equalizer box for an inground DTO28H side by side drive over 8,000 lbs lift in the Olmsted County shop. All services such as concrete cutting, hydro hammer, and excavation done by us. We also poured the new concrete on 7/13/16.

LEC 13 LEC 12 LEC 11LEC 14 LEC 10LEC 7 LEC 9 LEC 8 LEC 6 LEC 5 LEC 4 LEC 3 LEC 2 LEC 1LEC 16LEC 15